Kanban and Scrum are two popular project management methodologies in Agile, but they have key differences:

  • Structure and rhythm:

    • Scrum works in fixed-length iterations (sprints) (usually 2-4 weeks), with clearly defined roles (Scrum Master, Product Owner, team) and ceremonies (planning, daily stand-ups, retrospectives).
    • Kanban has no fixed iterations; work is continuous, and tasks move across a visual board with columns reflecting stages of the process.
  • Changes in the process:

    • In Scrum, changes during a sprint are minimal; tasks are fixed for the sprint duration.
    • In Kanban, tasks can be added and changed at any time, providing flexibility.
  • Constraints:

    • Kanban uses work-in-progress (WIP) limits to avoid overload.
    • Scrum limits work by sprint and the volume of tasks within it.
  • Planning approach:

    • Scrum requires sprint planning and task estimation.
    • Kanban is more focused on flow and process optimization.

Example of a Kanban board:

| Backlog | In Progress (WIP=3) | Testing | Done |
|---------|---------------------|---------|-------|
| Task1   | Task2               | Task3   | Task4 |

Thus, Kanban is more flexible and continuous, while Scrum is a structured and iterative approach.