How can you determine that regression testing has passed successfully?
sobes.tech AI
Answer from AI
- All critical and high-priority defects identified during testing have been resolved and verified.
- No new critical defects or defects affecting core functionality have been found in the parts of the system impacted by changes.
- No new defects have been found in parts of the system not directly affected (assuming broad regression coverage).
- Stability of key automated regression tests. A high percentage of tests passed (usually > 95-98% depending on project criteria).
- System behavior matches expected results, verified manually and through automated tests.
- No degradation in performance and resource consumption at control points (if non-functional regression tests are available).
- A regression testing report confirming that all planned tests have been executed and the status of found defects.
- Confidence of the team (development, QA, product management) in the build's readiness for further deployment (e.g., to the next test cycle or production).