Situation: an analyst confirmed that it is a feature, promises to make a change in the technical specification later, but not now. What will you do with the defect?

sobes.tech AI

Answer from AI

In such a situation, I would log the defect in the bug tracker with a note that the analyst confirmed it as a feature, but the change in the technical specification (TS) will be made later. This is important for transparency and history. Next, I will clarify when exactly the TS update is planned and coordinate with the team on how to proceed with testing this functionality until the changes are made. If the feature is not critical, the defect can be temporarily closed with a note "awaiting TS update." If it affects product quality, it is worth raising the issue in the planning meeting to ensure important checks are not missed.